sasintl sasintl sasintl sasintl

GLOBAL CONTRACT FOR COOLING TOWER MAINTENANCE SERVICES FOR RABIGH REFINING & PETROCHEMICAL COMPANY - Ongoing


Electro Mechanical Maintenance Service of all SADARA Cooling Towers (Long Term) - Ongoing

  • Vibration analysis for fan motors
  • Rotational analysis for fan hub and leaves
  • Pitch angle analysis and rectification for mechanical draft fan leaves

Revamping Activities for CT-6 (Petro Rabigh) Cells: 04 No's


COOLING TOWER MAINTENANCE SERVICES FOR FARABI PETROCHEMICALS COMPANY


INSTALLATION OF PROTECTION NET FOR CT 1, CT 2 & CT 3 PETRO RABIGH


REVAMPING ACTIVITIES FOR 2 CELLS MARINE COOLING TOWER, UO2 PACKAGE


Revamping Of CT-2 Cooling Tower At Petro Rabig

  • Revamping Of CT-2 cooling towers.

Construction, Erection, Commissioning of SADARA Cooling Towers

  • Cooling Tower Erection and Commissioning @ Daelim ISS Project, SADARA
  • Cooling Tower Erection and Commissioning @ Daelim MFC Project, SADARA
  • Erection and Commissioning of Cooling Tower @ L&T Polyethylene Project, SADARA

Maintenance of Cooling Tower Cells
Electro Mechanical maintenance of Cooling towers
Electro Mechanical maintenance of Cooling towers
Electro Mechanical maintenance of Cooling towers
Maintenance of Cooling Tower Cells
Maintenance of Cooling Tower Cells
Maintenance of Cooling Tower Cells
Maintenance of Cooling Tower Cells
>Cleaning/Repair of Cooling Tower
>Cleaning/Repair of Cooling Tower
>Cleaning/Repair of Cooling Tower
>Cleaning/Repair of Cooling Tower
>Cleaning/Repair of Cooling Tower
Revamping Of CT-3
Revamping Of CT-3
Electro Mechanical maintenance of Cooling towers
Maintenance of Cooling Tower Cells
Maintenance of Cooling Tower Cells

Sidem Saudi Arabia

  • Procurement, Fabrication, Grid blasting & painting and Erection of Chemical Storage Shelter, Lime Stone Storage Shelter and Central Chemical Preparation Plant(Pre- Fabricated Structure) for Marafiq.

SIDEM
SIDEM
SIDEM

Revamping Sipchem Cooling Tower

  • Scope of Services Includes:
  • Production of Required amount of fill packs and drift eliminators.
  • Removing of existing fill packs and replacing with newly produced.
  • Servicing of Existing sprinklers, along with provision of replacement.
  • Removal and Replacement of Drift Eliminators

Turn Around Maintenance of Cooling Tower 19 ABS For Arabian Petrochemical Co. (PETROKEMYA)

  • Scope of Work Includes:
  • Cleaning of Side Sheets, and cleaning of structure.
  • Removal and Replacement of Compete Side Baffle Louvers.
  • Sludge Removal from Basin and Disposal.
  • HPWJ and cleaning of Basin Walls and Floors, Civil Repair of Basin.

Revamping Of Cooling Tower At Petro Rabig Phase I & II

  • Revamping OF CT-1, CT-2,CT-3, CT-4, CT-5, CT-6, CT-20, CT-30, CT-40 cooling towers.

Gusat Construction co.

  • Construction Steel Building for warehouse at SADARA.
  • Construction of Steel Building for Mess hall at SADARA.
  • Fabrication, supply and erection of Portable Building for SADARA.

POSCO Engineering (SIPCHEM)

  • Erection & Installation of Duct plates & Stud Bolts for SIPCHEM WCC Projects
  • Field fabrication and Erection of pipe lines
  • Construction of multistory Structural Steel Building

Inginia Polymers

  • Erection of four stage tower
  • Erection of extruders
  • Erection of polymer plant

Fluor

  • Crane Girder for Ma’aden
  • Fabricated Ducts for Ma’aden project
  • Fabrication Machining & Supply of Shafts and levers
  • Construction and Supply of HCM & HRM Mixing Tank